01
PROJECT INPUT
Project inputs
Country, capacity, stage, product mix, operating regime and known constraints.
SIGMAThe historical 20,000–500,000 m³/year corpus becomes a controlled digital product: inputs → assumptions → calculation → saved result → engineering action.
All legacy coefficients and numeric assumptions remain SOURCE CLAIM until engineering validation.
Normalized project data
Engineering rules / evidence
Server-side logic
Saved assumptions + result
Backend access check