SIGMA

Equipment as part of a production system.

The catalog is organized by process stage, function and integration conditions — not as a list of isolated machines.

01
RAW MATERIALS

Raw-material preparation

Crushing, grinding and storage of raw materials.
02
DOSING

Dosing

Dry and liquid components linked to recipe and production regime.
03
MIXING

Mixing

AAC mix preparation coordinated with upstream and downstream process.
04
CASTING

Mould systems

Moulds, base plates and handling interfaces.
05
LOGISTICS

Hardening cars

Inter-operation transport and hardening logistics.
06
TILTING

Tilting systems

Demoulding and tilting for the applicable process architecture.
07
CUTTING

Cutting systems

Cut geometry, material state and next-stage interfaces.
08
TRANSFER

Transfer systems

Gantry and transfer systems between process nodes.
09
AUTOCLAVING

Autoclaves

Autoclaves, autoclave cars and loading logistics.
10
HANDLING

Material handling

Post-autoclave flow and handling.
11
PACKAGING

Packaging

Strapping, palletizing and dispatch preparation.
12
AUTOMATION

Automation

Controls, sequencing, alarms, production data and interfaces.
13
AUXILIARY

Auxiliary systems

Dust collection, utilities and auxiliary equipment.

Function → Compatibility → Integration → Verified Data → Documentation → RFQ

Every equipment object should explain its role in the AAC process and the conditions for correct integration.

01FUNCTION

Process problem solved

02COMPATIBILITY

Applicable plant configurations

03INTEGRATION

Interfaces, utilities and constraints

04EVIDENCE

Verified specifications and claims only

05DOCUMENTATION

Documents, images, 3D and related entities

06ACTION

Configuration / technical discussion / C-910

Third-party line compatibility is published only after engineering validation.